A billion! How much DRS could benefit local charities
One in five people using a UK-wide deposit return system would donate the deposits they had paid on drinks cans and bottles to charity all the time, producing potential annual donations of more than £1 billion to good causes.
The results came from a survey carried out by ICM Unlimited and published by CPRE on Monday (May 27).
A further 19 per cent of respondents said they would donate their deposits most of the time, and more than a third (34 per cent) would donate at least some of the time.
This could lead to a further £1.3 billion in donations to local charitable causes from the deposits on glass and plastic drinks bottles and aluminium cans, the CPRE analysis found.
The donations could be even higher if drinks cartons and pouches were also included in England’s deposit system – something Environment Secretary Michael Gove is considering.
CPRE states that by including an option for the public to donate their deposits – something that is part of most other deposit systems around the world – we could build on the huge success of the carrier-bag charge, which, as well as reducing plastic bag usage by more than 80 per cent, raised £66 million for good causes in 2016-17.
Samantha Harding, CPRE’s litter programme director, said: “Not only would the introduction of a UK-wide deposit return system put a stop to most of the environmental damage caused by drinks containers and boost recycling rates in excess of 90 per cent, it could also provide much-needed funding for good causes across the country.
“It is fantastic and really heartening that so many people would be happy to donate their deposits in this way.
“An effective ‘all-in’ deposit return system will bring an end to the growing disenchantment and scepticism around current recycling methods by doubling current recycling rates.
“But it’s also evident that the deposit, as well as encouraging the right behaviour in terms of recycling, would allow for people’s generous natures to be realised when it comes to supporting others.
‘It’s important to ensure that England’s scheme includes every bottle, can, carton and pouch, whatever the shape, size or material.
“Not only will this halt the devastation caused to our countryside and environment by drinks container pollution, but if every type of drinks packaging is included in the scheme, it could result in more donated deposits, benefiting nature and local communities.”
In the UK, it is estimated that 28 billion single-use glass, plastic and aluminium drinks bottles and cans are sold every year in the UK, according to recent government figures.
Due to ineffective waste collection and recycling systems, overall recycling rates in the UK have stagnated at about 45 per cent. This results in a large number of drinks containers either left polluting the countryside, waterways and streets or being sent for incineration or buried in landfill, rather than recycled.
Through its monetary incentive, an effective UK-wide deposit return system has the potential to boost recycling rates for drinks containers to more than 90 per cent.
CPRE is highlighting that this would significantly reduce the environmental damage they cause, as well as ensuring that the producers of drinks packaging become financially responsible for the full costs of the waste they create.
Earlier this month, the Scottish government announced its plans to introduce a deposit return system for glass, plastic and aluminium drinks containers of all sizes.
CPRE is calling for the UK government to build on Scotland’s ambition by introducing a fully comprehensive ‘all-in’ system, including all drinks containers of all sizes and materials, to make sure that England gets the most effective and economically viable deposit system in the world.
Monday, June 3, 2019
- A number of important documents have yet to emerge. For example, a rigorous transport plan and a finalised air-quality assessment. The latter is critical given that allocations at Teynham will feed extra traffic into AQMAs.
- There seems to be no coherent plan for infrastructure delivery – a key component of the plan given the allocations being proposed near the already crowded Junction 7.
- There seems to have been little or no cooperation with neighbouring boroughs or even parish councils within Swale itself.
The removal of a second consultation might have been understandable if this final version of the plan were similar to that being talked about at the beginning of the consultation process. It is, however, radically different in the following ways:
- There has been a major shift in the balance of housing allocations, away from the west of the borough over to the east, especially around the historic town of Faversham. This is a move that raises many concerns.
- A new large allocation, with accompanying A2 bypass, has appeared around Teynham and Lynsted, to which we are objecting.
- Housing allocations in the AONB around Neames Forstal that were judged “unsuitable” by the council’s own officers have now appeared as part of the housing numbers.
- Most of the housing allocations being proposed are on greenfield sites, many of them on Grade 1 agricultural land – a point to which we are strongly objecting.
Concerns about the rush to submit the plan
The haste with which the plan is being prepared is especially worrying given the concentration of housing in Faversham. If the town is to take a large amount of new housing, it is imperative that the policies concerning the area are carefully worked out to preserve, as far as possible, the unique nature of the town. The rush to submit the plan is likely to prove detrimental.
As Swale does not have a five-year land housing supply, it is open to speculative development proposals, many of which would run counter to the ideas contained in the current plan. Some are already appearing. This is a common situation, and one that, doubtless, is a reason behind Swale’s haste.
Our overriding fear, however, is that this emphasis on haste is ultimately going to prove counterproductive. This is because it is our view that the plan, in its current form, is unlikely to pass independent examination. We are urging Swale to listen to and act upon the comments being made about the plan and to return the plan to the council with appropriate modifications before submitting it to the Secretary of State.
Essentially, this means treating the current consultation not as the final one but as the ‘lost’ second consultation.
The consultation ends on Friday 30 April and we strongly urge residents to make their opinions known if they have not already done so.
Further information