Skip to content

Farmland that could grow 250,000 tonnes of vegetables a year lost to development, research shows

Elementary Admin
By Elementary Admin &
20th July 2022

Almost 14,500 hectares of the country’s best agricultural land has been lost to development since 2010 (pic Julie Davies)

•          Two million fewer people can be fed their five a day from vegetables homegrown in England as prime farmland lost to development

•          Food security concerns increase, with 60 per cent of England’s finest agricultural land at the highest risk of flooding from climate change

•          Almost 300,000 homes have been built on prime farmland – with an extra 1,400 hectares used for renewable-energy projects – despite more than enough previously developed brownfield land waiting for regeneration

England’s future food security has been called into question after losing farmland capable of feeding the combined populations of Liverpool, Sheffield and Manchester their five a day.

New research by CPRE, the countryside charity, found almost 14,500 hectares of the country’s best agricultural land, which could grow at least 250,000 tonnes of vegetables a year based on typical yields, has been permanently lost to development since 2010.

There was an exponential rise in Best and Most Versatile (BMV) agricultural land set aside for housing and industry between 2010 and 2022, from 60 hectares to more than 6,000 hectares per year.

Almost 300,000 homes were built on more than 8,000 hectares of prime farmland. This is despite there being space for 1.3 million homes to be built on more than 26,000 hectares of previously developed brownfield land, much of it disused and derelict urban patches of the midlands and north most in need of regeneration.

The increased risk of severe flooding caused by climate change will further challenge food security in future. More than 200,000 hectares – or 60 per cent – of England’s finest Grade 1 agricultural land is within areas at the highest risk of flooding, known as Flood Zone 3. Our most productive farmland is disproportionately close to river and coastal flood plains, with 75 per cent of BMV in the East Midlands and 95 per cent of BMV in the east of England at the highest risk of flooding.

That is why CPRE is calling on the government to introduce a comprehensive, cross-departmental land-use strategy. It must provide a planning framework to balance the competing and often conflicting demands for farming, housing and energy on a finite amount of land while also meeting legally binding net-zero targets. You can report the CPRE report Building on Food Security here.

The National Planning Policy Framework, which is due to be updated next year, should prioritise a ‘brownfield first’ approach to housebuilding, with a preference for medium- and higher-density units to help protect our most valuable agricultural land wherever possible. There should be a firm presumption against development on BMV land.

Crispin Truman, chief executive of CPRE, said: “For the first time in several generations, our food security is at risk – yet we’ve seen a 100-fold increase in the loss of our best farmland to development since 2010. Heating, eating and housing are fundamental needs. A healthy environment, mitigating and adapting against the devastation threatened by the climate emergency is the bedrock that underpins them all. We need to know what to put where. That’s why we need a land-use strategy.

“Maintaining agricultural land for domestic food production is critical. This must be achieved in the context of addressing and adapting to climate change, reversing the loss of nature and increasing demands on land for other purposes, not least housing and production of renewable energy.

“As we face a cost-of-living crisis, housing crisis and the adjustment of our farming sector to post-Brexit subsidies, we have multiple, critical priorities for our land. We need to move away from intensive farming practices and towards a more ‘multifunctional’ approach, reconciling food production with better management for natural and cultural heritage, and for public access. Policies which are put in place now will be crucial in the coming years to ensure the most efficient use of our land in the face of these challenges.”

CPRE’s report on the loss of agricultural land is believed to be the first ever to quantify the scale of development nationally on the two highest and most productive grades of farmland. The east of England has seen high levels of development on BMV land, with more than 3,200 hectares lost over the past 12 years. This is followed closely by the South East, with almost 3,000 hectares of BMV land disappearing overall and the greatest loss to development of Grade 1 land, which is rated excellent quality.

A further 1,400 hectares of BMV land was taken out of agricultural production for renewable-energy projects in the same period. CPRE estimates that this formerly productive farmland produces less than 3 per cent of the UK’s total installed solar capacity, or 0.3GW out of 14GW, suggesting it’s entirely possible for the government to balance food and energy security, particularly if rooftop solar and offshore wind are prioritised.

Climate change is likely to have severe consequences for our finest farmland and presents an increased threat to food security. Protecting our Best and Most Valuable agricultural land from permanent development now is vital if we are to maintain a secure food supply.

The Best and Most Versatile agricultural land grades:

•            Grade 1: excellent quality agricultural land – land with no or very minor limitations and yields are high and less variable. A very wide range of agricultural crops can be grown such as: apples and pears/salad crops/soft fruit-like berries/winter-harvested vegetables

•            Grade 2: very good quality agricultural land – land with minor limitations that affect crop yields, cultivations or harvesting. Generally high-yielding land but may be lower or more variable than Grade 1. 

•            Grade 3a: good quality agricultural land – land that can consistently produce moderate to high yields of a reduced variety of arable crops, such as: cereals/sugar beet/potatoes.

Methodology

Development on BMV land analysis: To understand the quantities of BMV land that have been built on since 2010, we used several spatial datasets from Natural England and a development dataset obtained from development consultancy Glenigan. The majority of information on the ALC Grade of soils throughout the country is based on the old system, which does not include Grades 3a and 3b and instead places both of these grades into an aggregated Grade 3. Using GIS tools and the post-1988 dataset, we were able to determine which developments in our dataset fell into Grade 3a land, and as a result could be considered BMV for our findings. It should be noted that the post-1988 dataset covers only 8 per cent of rural England and, as a result, we were only able to identify 3 per cent of the Grade 3 land that fell into Grade 3a or 3b.  

Appeals analysis: During April 2022, CPRE collated inspector reports from planning appeals platform Compass. A key-word search was conducted using the phrases ‘BMV’ and ‘Best and Most Versatile’ to identify the relevant appeals. 

Flooding risk analysis: To assess the risk faced by BMV to flooding, CPRE used the existing ‘provisional’ mapping dataset and the Environment Agency’s flood risk for planning, Flood Zone 3 datasets to understand where areas of BMV land were falling in relation to high flood risk areas. Using GIS tools, these two spatial datasets were overlaid and the intersect between Flood Zone 3 and Grade 1 areas was measured.

Solar energy production: There are currently 14GW (gigawatts) of solar power installed in the UK. Using Carbon Trust and Energy Saving Trust data, we estimate that 1GW of capacity supplies 8TWh (terawatt hours) of energy per year, so installed solar capacity is supplying about 112TWh. The 1,400 hectares of solar installations on BMV land should produce about 2.8TWh, which is 2.5 per cent of current installed solar capacity.

Wednesday, July 20, 2022


  • A number of important documents have yet to emerge. For example, a rigorous transport plan and a finalised air-quality assessment. The latter is critical given that allocations at Teynham will feed extra traffic into AQMAs.
  • There seems to be no coherent plan for infrastructure delivery – a key component of the plan given the allocations being proposed near the already crowded Junction 7.
  • There seems to have been little or no cooperation with neighbouring boroughs or even parish councils within Swale itself.

The removal of a second consultation might have been understandable if this final version of the plan were similar to that being talked about at the beginning of the consultation process. It is, however, radically different in the following ways:

  • There has been a major shift in the balance of housing allocations, away from the west of the borough over to the east, especially around the historic town of Faversham. This is a move that raises many concerns.
  • A new large allocation, with accompanying A2 bypass, has appeared around Teynham and Lynsted, to which we are objecting.
  • Housing allocations in the AONB around Neames Forstal that were judged “unsuitable” by the council’s own officers have now appeared as part of the housing numbers.
  • Most of the housing allocations being proposed are on greenfield sites, many of them on Grade 1 agricultural land – a point to which we are strongly objecting.

Concerns about the rush to submit the plan

The haste with which the plan is being prepared is especially worrying given the concentration of housing in Faversham. If the town is to take a large amount of new housing, it is imperative that the policies concerning the area are carefully worked out to preserve, as far as possible, the unique nature of the town. The rush to submit the plan is likely to prove detrimental.

As Swale does not have a five-year land housing supply, it is open to speculative development proposals, many of which would run counter to the ideas contained in the current plan. Some are already appearing. This is a common situation, and one that, doubtless, is a reason behind Swale’s haste.

Our overriding fear, however, is that this emphasis on haste is ultimately going to prove counterproductive. This is because it is our view that the plan, in its current form, is unlikely to pass independent examination. We are urging Swale to listen to and act upon the comments being made about the plan and to return the plan to the council with appropriate modifications before submitting it to the Secretary of State.

Essentially, this means treating the current consultation not as the final one but as the ‘lost’ second consultation.

The consultation ends on Friday 30 April and we strongly urge residents to make their opinions known if they have not already done so.

Further information